1 2 3
.

Date: 1911-03 

Description: Construction workers pose during construction of the main office at the Wisconsin River dam site.

Date: 1911-03 

Description: Workers use a rail car mounted crane to load pilings onto a barge. Bluffs are visible in the distance.

Date: 1911-10-18 

Description: Workmen stand on damaged and partly submerged railroad track on the west shore of the Wisconsin River.

Date: 1914-02-01 

Description: A view looking west toward the lock and power house at the Prairie du Sac dam. Pilings and the elevated trestle are in the foregound. Men can be seen work...

Date: 1913-02-08 

Description: A winter view with workers posing with brush mats at the power dam construction site. The gate guides and high trestle form the background.

Date: 1911-09-12 

Description: An overview of the dam site on the Wisconsin River from the west shore. Three pile drivers are at work on the coffer dam. The railroad trestle is in the...

Date: 1912-01-20 

Description: Two men stand on a rail car on the narrow gauge electric railroad crossing the river at the dam construction site. The portion of track in the background...

Date: 1912-07-16 

Description: Workers pose inside the coffer dam. The narrow gauge railroad is behind them. One of the pile drivers is in the background. A bare area on the bluff in...

Date: 1911 

Description: Newly constructed office building at construction site, with buggy in attached shed.

Date: 1915-02-28 

Description: A view, looking east, of the power house, lock, and dam on the Wisconsin River.

Date: 1883 

Description: Bird's-eye map of Prairie du Sac, Wisconsin with an inset of Clifton.

Date: 1911-04 ca.

Description: Men stand on and beside a rail car in front of the main construction office at the site of the Wisconsin River dam.

Date: 1912-05-17 

Description: Workmen pour concrete from the elevated railroad into forms below.

Date: 1912-11-21 

Description: Two workmen stand in the outlet of a steel draft tube in the power house, while other men work above it. Cars move along the elevated trestle above.

Date: 1912-10-17 

Description: Concrete plant at east end of the dam, showing the mixers, crane, and a rail car at the abutment.

Date: 1915 before

Description: A group of workers pose on the east bank of the Wisconsin River at the power dam contruction site. One man strums his shovel like a banjo; another stands...

Date: 1913 

Description: View down middle of unpaved street of the central business district. A man is sitting in the driver's seat of an automobile along the left curb near a gara...

Date: 1912-08-01 

Description: An overview of the power dam construction site from the west, showing the elevated trestle, coffer dam, and steam pile drivers. The concrete plant is visi...

Date: 1912-05-17 

Description: Workers use shovels to level fresh concrete at the base of the chutes from the high trestle. The steam powered pile driver is at work in the background.

Date: 1908 ca.

Description: Lodde's mill and surroundings, west of Sauk City.

1 2 3

Have Questions?

If you didn't find the material you searched for, our Library Reference Staff can help.

Call our reference desk at 608-264-6535 or email us at:

.
.