Date: 1913-05-28 

Description: Power dam construction workers pause during a meal in the camp dining room. Oil lamps hang from the ceiling; overhead electric lights are also installed.

Date: 1913-05-28 

Description: Cooks pose in the kitchen at the power dam workers' camp.

Date: 1912-09-30 

Description: Pile drivers work within the confines of the coffer dam. Men on the high trestle construct chutes for pouring concrete.

Date:  

Description: A group portrait of Pearl Clough, Myrtle Stoddard, Fraua Wiswall, Zilla Wiswall, and Roy Stoddard (probably left to right). Three of the women are posed to...

Date: 1911-04 ca.

Description: Men stand on and beside a rail car in front of the main construction office at the site of the Wisconsin River dam.

Date: 1965 

Description: Radio announcer Del Viney on the air inside Wisconsin's Very Live Radio (WVLR) station during the dinner music show.

Date: 1906 ca.

Description: View across yard of house with large group of people gathered on porch posing for photograph.

Date: 1911-05-06 

Description: Workmen pose while erecting the first smoke stack at the power plant construction site on the Wisconsin River. Two men have scaled the stack.

Date: 1912-07-25 

Description: A boy poses in the excavation site for the power house within the coffer dam. He is standing on the narrow gauge tracks; the high trestle is in the backg...

Date: 1912-03-03 

Description: Two women and a man pose among the timber pilings near the east shore of the river. Wooden concrete forms and two buildings can be seen in the background.

Date: 1911-04-14 

Description: Workers pose inside the forms for the east shore abutment at the power dam site.

Date: 1911-06 ca.

Description: Workmen pose during construction of the temporary steam power plant at the Prairie du Sac dam. These engines provided electric power for the construction...

Date: 1913-06-13 

Description: Workmen and machinery at the quarry on Blackhawk Bluff. The gravel was used in construction of the power dam.

Date: 1912-05-17 

Description: Workers use shovels to level fresh concrete at the base of the chutes from the high trestle. The steam powered pile driver is at work in the background.

Date: 1914 ca.

Description: A group of workmen pose while working on concrete forms at the Prairie du Sac dam site. Their position high above the water level affords an expansive ups...

Date: 1913-07-02 

Description: Workers pause while installing a maze of conduit for the switchboard in the power house. The construction camp is to the left.

Date: 1912-04-13 

Description: The concrete mixer stands near the newly poured east shore abutment while men work nearby. Reinforcing rods protrude from the abutment.

Date: 1911-04-22 

Description: Two men and a boy pose on rail cars carrying two 150 horse-power boilers for use in the temporary power plant at the dam construction site at Prairie du Sa...

Date: 1911-06-10 

Description: Dining rooms and kitchen at the camp on the construction site of the Prairie du Sac dam. Workers and children pose in front of the dining rooms; there are...

Date: 1912-05-17 

Description: Workmen pour concrete from the elevated railroad into forms below.