Date: 1913-11-01 

Description: Wooden forms are in place for construction of the walls of the lock at the Prairie du Sac dam. The newly constructed power house is on the left.

Date: 1912-05-09 

Description: Men with shovels work downstream from the east abutment, while others look on.

Date: 1913-03-19 

Description: A view, looking east, of the wreckage of the high trestle caused by flooding and ice. The concrete plant is visible on the far bank.

Date: 1923-10-23 

Description: Men work on the concrete chutes and elevated trestle. Iron reinforcing bars protrude from the forms.

Date: 1912-05-10 

Description: Work progresses on the wooden concrete forms at the east side of the river. The steam-powered pile drivers are also visible.

Date: 1913-04-07 

Description: Five men, two well-dressed, pose on electric rail cars during construction of the dam.

Date: 1911-10-12 

Description: High water on the Wisconsin River has submerged the coffer dam and trestle. Two pile drivers remain in place. Log pilings are floating near the western sh...

Date: 1906 

Description: Mr. Kleinlein poses outdoors with a photograph in his hand. There is a large building on a hill in the background.

Date: 1912-11-02 

Description: Workmen use a crane to erect the gate guides for the power house.

Date: 1912-11-21 

Description: Workmen pose on and in front of the steel draft tubes. The gate guides are visible on the right.

Date: 1912-05-17 

Description: Men working from the elevated road on the east end of the power dam, constructing shots (chutes) for the concrete.

Date: 1913-05-17 

Description: Progress on the power house construction, with the east portion of the wall complete, and men working on forms for the rest of the wall.

Date: 1912-05-31 

Description: Workmen pose outside the dining hall before dinner.

Date: 1912-05-03 

Description: Workmen on a barge use a pulley to raise sheet steel pilings which were damaged by high water in October, 1911.

Date: 1912-11-21 

Description: An overview of the progress of construction within the coffer dam shows the gate guides and draft tubes in place. Concrete forms and chutes, as well as ti...

Photograph

Salem Church

Date: 1935 ca.

Description: Salem Church of the Evanglical Association of North America. The original church was built in 1851 in the township of Honey Creek. This church is the third...

Photograph

Runway Through Dam

Date: 1912-07-01 

Description: A view through the runway (tunnel) cast into the concrete structure of the power dam at Prairie du Sac.

Date: 1965 

Description: James Kirchstein, Wisconsin's Very Live Radio (WVLR) station chief engineer and originator, inside his recording company, Sara Sound Productions, Inc. WVL...

Date: 1914-11-03 

Description: Interior view of the power house with the Allis-Chalmers generators installed.

Date: 1913-05-28 

Description: Completed east portion of the first story of the generator room of the power house. Forms are in place at the west end.