Date: 1911-04-14 

Description: Workers pose inside the forms for the east shore abutment at the power dam site.

Date: 1913-06-29 

Description: View from the west bank of the Wisconsin River showing progress on the power dam. The narrow gauge track is visible in the foreground.

Date: 1911-08-06 

Description: A view following the lower trestle to the west bank. The construction camp buildings, including the office and temporary power plant are seen on the left.

Date: 1913-01-09 

Description: Men stand in the completed draft tubes after removal of the steel forms.

Date: 1911-10-12 

Description: High water has scattered timber pilings through the construction camp. The office is on the right; the smoke stacks of the temporary power plant are visib...

Date: 1965 

Description: Radio announcer Del Viney on the air inside Wisconsin's Very Live Radio (WVLR) station during the dinner music show.

Date: 1915 before

Description: A group of workers pose on the east bank of the Wisconsin River at the power dam contruction site. One man strums his shovel like a banjo; another stands...

Date: 1906 

Description: Mr. Kleinlein poses outdoors with a photograph in his hand. There is a large building on a hill in the background.

Date: 1911-09-12 

Description: An overview of the dam site on the Wisconsin River from the west shore. Three pile drivers are at work on the coffer dam. The railroad trestle is in the...

Date: 1911-03 

Description: Workers use a rail car mounted crane to load pilings onto a barge. Bluffs are visible in the distance.

Date: 1913-05-17 

Description: Progress on the power house construction, with the east portion of the wall complete, and men working on forms for the rest of the wall.

Date: 1913-06-13 

Description: A view, from the west, of the quarry on Blackhawk Bluff. Gravel from the quarry was used in concrete for the construction of the power plant and dam.

Date: 1912-05-17 

Description: Workers use shovels to level fresh concrete at the base of the chutes from the high trestle. The steam powered pile driver is at work in the background.

Date: 1912-04-12 

Description: A diver poses with other workmen at the power dam construction site prior to assessing underwater damage.

Date: 1912-11-02 

Description: Workmen use a crane to erect the gate guides for the power house.

Date: 1912-07-16 

Description: An overview, from the west bank, of the power dam construction site. The high trestle is in the background, and the narrow gauge electric railroad is in t...

Date: 1913-09-01 

Description: A view of the power house from the southwest showing progress of the brickwork. Two cars stand on the railroad extension. Workers are pushing cars along...

Date: 1912-05-17 

Description: Workmen pour concrete from the elevated railroad into forms below.

Date: 1914 ca.

Description: A group of workmen pose while working on concrete forms at the Prairie du Sac dam site. Their position high above the water level affords an expansive ups...

Date: 1965 

Description: Station manager Ron Nicols and an International Scout truck with plow outside Wisconsin's Very Live Radio station headquarters. WVLR shared quarters with C...

1 2 3 4 5 6 7

Have Questions?

If you didn't find the material you searched for, our Library Reference Staff can help.

Call our reference desk at 608-264-6535 or email us at:

.
.