Date: 1913-11-01 

Description: Wooden forms are in place for construction of the walls of the lock at the Prairie du Sac dam. The newly constructed power house is on the left.

Date: 1911-04 

Description: Workmen pose on a steam-powered pile driver at work at the north end of the slough on the Wisconsin River. The railroad was extended from the village to t...

Date: 1912-05-09 

Description: Men with shovels work downstream from the east abutment, while others look on.

Date: 1913-03-19 

Description: A view, looking east, of the wreckage of the high trestle caused by flooding and ice. The concrete plant is visible on the far bank.

Date: 1910 ca.

Description: A view of high water on the Wisconsin River from a bluff on the west bank. The photograph is undated and does not indicate if it was taken prior to the co...

Date: 1923-10-23 

Description: Men work on the concrete chutes and elevated trestle. Iron reinforcing bars protrude from the forms.

Date: 1912-05-10 

Description: Work progresses on the wooden concrete forms at the east side of the river. The steam-powered pile drivers are also visible.

Date: 1913-04-07 

Description: Five men, two well-dressed, pose on electric rail cars during construction of the dam.

Date: 1911-10-12 

Description: High water on the Wisconsin River has submerged the coffer dam and trestle. Two pile drivers remain in place. Log pilings are floating near the western sh...

Date: 1906 

Description: Mr. Kleinlein poses outdoors with a photograph in his hand. There is a large building on a hill in the background.

Date: 1912-11-02 

Description: Workmen use a crane to erect the gate guides for the power house.

Date: 1912-11-21 

Description: Workmen pose on and in front of the steel draft tubes. The gate guides are visible on the right.

Date: 1912-05-17 

Description: Men working from the elevated road on the east end of the power dam, constructing shots (chutes) for the concrete.

Date: 1883 

Description: Bird's-eye map of Prairie du Sac, Wisconsin with an inset of Clifton.

Postcard

Main Street

Date: 1907 ca.

Description: House and retail stores lining Main Street.

Date: 1913-05-17 

Description: Progress on the power house construction, with the east portion of the wall complete, and men working on forms for the rest of the wall.

Date: 1912-05-31 

Description: Workmen pose outside the dining hall before dinner.

Date: 1912-05-03 

Description: Workmen on a barge use a pulley to raise sheet steel pilings which were damaged by high water in October, 1911.

Date: 1910-08-11 

Description: The first machinery at work sounding at the site for the power dam. Workmen pose near the carriage-mounted equipment. A horse-drawn wagon is in the backg...

Date: 1912-11-21 

Description: An overview of the progress of construction within the coffer dam shows the gate guides and draft tubes in place. Concrete forms and chutes, as well as ti...