Date: 1912-07-16 

Description: Workers pose inside the coffer dam. The narrow gauge railroad is behind them. One of the pile drivers is in the background. A bare area on the bluff in...

Date: 1912-08-01 

Description: An overview of the power dam construction site from the west, showing the elevated trestle, coffer dam, and steam pile drivers. The concrete plant is visi...

Date: 1912-09-30 

Description: Forms have been removed from the first concrete poured for the power house in the northeast corner of the coffer dam. Men pour concrete from rail cars on...

Date: 1913-01-09 

Description: Men stand in the completed draft tubes after removal of the steel forms.

Date: 1913-06-13 

Description: A view, from the west, of the quarry on Blackhawk Bluff. Gravel from the quarry was used in concrete for the construction of the power plant and dam.

Date: 1913-07-02 

Description: Workers pause while installing a maze of conduit for the switchboard in the power house. The construction camp is to the left.

Date: 1913-11-01 

Description: A view from the hill, looking northeast at the power house at the Prairie du Sac dam. Much of the brickwork has been completed. Concrete forms for the lo...

Date: 2008 

Description: Felix Ohrlien's gas station, at 105 Water Street, was built in 1944-45 and is still in use today, however it is now owned and operated by Dick Ambrose, who...

Date: 1913-11-01 

Description: Wooden forms are in place for construction of the walls of the lock at the Prairie du Sac dam. The newly constructed power house is on the left.

Date: 1923-10-23 

Description: Men work on the concrete chutes and elevated trestle. Iron reinforcing bars protrude from the forms.

Date: 1911-06-19 

Description: Looking west over the Wisconsin River at the unfinished narrow gauge railroad trestle built for construction of the dam. Two pile drivers are seen in the...

Date: 1912-07-16 

Description: An overview, from the west bank, of the power dam construction site. The high trestle is in the background, and the narrow gauge electric railroad is in t...

Date: 1914-02-01 

Description: A view looking west toward the lock and power house at the Prairie du Sac dam. Pilings and the elevated trestle are in the foregound. Men can be seen work...

Date: 1908 ca.

Description: Side view of church converted to offices of Dresen Brothers Contractors and Manufacturers. Sign on bulding reads: "Dresen Brothers Twin City Contractors &...

Date: 1912-11-21 

Description: Workmen pose on and in front of the steel draft tubes. The gate guides are visible on the right.

Date: 1912-11-02 

Description: Workmen use a crane to erect the gate guides for the power house.

Date: 1914-08-04 

Description: An interior view of the power house at the Prairie du Sac dam showing the switchboard.

Date: 1914-03-11 

Description: Looking east from the lock at the Prairie du Sac dam. Recently completed buttresses are in the foreground, with earlier stages of construction visible, in...

Date: 1911-05-06 

Description: Workmen pose while erecting the first smoke stack at the power plant construction site on the Wisconsin River. Two men have scaled the stack.

Date: 1912-03-03 

Description: Two women and a man pose among the timber pilings near the east shore of the river. Wooden concrete forms and two buildings can be seen in the background.