Photograph
North Shore Drive
North Shore Drive (formerly Law Parkway) is open to traffic all the way from East Wilson Street to Proudfit Street, Brittingham Park Drive and West Washington Avenue. Paving of the last link between Broom and Bedford Streets was completed by Contractors Icke and Pankow, who repaired the base, and Payne and Dolan who did the asphalt surfacing. The photograph was taken looking east. |
Image ID: | 81517 |
---|---|
Creation Date: | 09 04 1953 |
Creator Name: | Vinje, Arthur M., 1888-1972 |
City: | Madison |
County: | Dane |
State: | Wisconsin |
Collection Name: | Arthur M. Vinje photographs and negatives, circa 1914-circa 1962 |
Genre: | Photograph |
Original Format Type: | negative, original |
Original Format Number: | PH 6442.5055A |
Original Dimensions: | 5 x 4 inches |
1 of 4 negs. Published in the Wisconsin State Journal on Sept. 5, 1953. |
Roads |
Automobiles |
Trees |
Lakes |
Outdoor photography |
Parks |
Road construction industry |
This image is © copyrighted property of Wisconsin State Journal and is provided by the Wisconsin Historical Society subject to contract. Use of the image requires written permission from the staff of the Collections Division. It may not be sold or redistributed, copied or distributed as a photograph, electronic file, or any other media. The image should not be significantly altered through conventional or electronic means. Images altered beyond standard cropping and resizing require further negotiation with a staff member. Please Credit: Wisconsin Historical Society |
Location: | Wisconsin Historical Society Archives, 4th Floor, Madison, Wisconsin |
---|