Search the Wisconsin Historical Society's collections

Searching for

Refine by

Results 1-4 of 4

Photograph

Building the Central Railway Tunnel

Date: 12 23 1895
Description: Horse-drawn implement makes a cut at a crossing where the tunnel will be made for the Wisconsin Central Railway.
Photograph

Wisconsin Central Railway Construction

Date: 12 11 1895
Description: View of the construction area of the Wisconsin Central Railway, looking southeast at Shipyard Point with workers and a team of horses.
Photograph

Repaving & Widening Preparations for Washington Street

Date: 1948
Description: View down sidewalk along Washington Street facing east. Excavation is going on between S. 8th and S. 9th Streets. A crew is mixing concrete and doing work ...
Photograph

Washington Street Repaving & Widening

Date: 1948
Description: Crews of the Vinton Construction Co. are laying a 20 foot wide concrete slab in front of the northeast corner of Washington and S. 9th Streets. A truck is ...

Have Questions?

If you didn't find the material you searched for, our Library Reference Staff can help.

Call our reference desk at 608-264-6535 or email us at: