click zoom to display a high-res image
High Water at Prairie du Sac Dam
Image
Elevated view of high water on the Wisconsin River which has inundated the coffer dam at the construction site. The narrow gauge railroad (curved line in foreground, right) is nearly submerged. Two workmen are standing behind one of the pile drivers.
October 11, 1911
Eberhart, F. S.
Publication Information
Physical Description
Collection Information
Copyright Information
W012GI6
WHi 47122
Image
Digital Collections
Explore more than 100,000 collection items online through the Society’s digital collections. For over two decades, we’ve been scanning, photographing, and digitizing materials from our collections, creating a rich and growing digital archive that brings history closer to you.
The Wisconsin Historical Society offers an ever-growing digital collection. Digitized materials reflect the full range of items in the collections including photographs, letters, newsletters, films, posters, architectural drawings, menus, and ephemera.
Attribution
For a credit line: Wisconsin Historical Society, Creator, Title, Unique Identifier.
The Unique Identifier can be found at the top or bottom of the page for each item. The name of a downloaded file is NOT the unique identifier.
For bibliographic citations please consult the UW-Madison Libraries Citation Research Guide to ensure compliance with appropriate style guidelines.
Accessing Collections
The vast majority of the items in our collections are not online. The Society owns thousands of archival collections viewable in our Archives reading room. To view and conduct research in our collections, visit us in person.
High Water at Prairie du Sac Dam
October 12, 1911
High water on the Wisconsin River has submerged the coffer dam and trestle. Two pile drivers remain in place. Log pilings are floating near the western shore.
High Bridge and West Shore Coffer Dam
August 1, 1912
Elevated view of the power dam construction site from the west, showing the elevated trestle, coffer dam, and steam pile drivers. The concrete plant is visible on the east bank. Note that high wate...
Driving Pilings for the Coffer Dam at Prairie du Sac Power Dam Site
July 20, 1911
Workmen stand on a barge carrying a steam-powered pile driver. The pilings will form the coffer dam necessary for construction of the power plant on the Wisconsin River.
Northeast View of Interior of Power House Coffer Dam
September 30, 1912
Pile drivers working within the confines of the coffer dam. Men are on the high trestle constructing chutes for pouring concrete.
Driving Sheet Piling at Power Dam
May 28, 1911
Men posing on a barge carrying a steam powered pile driver at work on the coffer dam for the construction of the powerhouse. Caption reads: "Driving Sheet Piling at Power Dam, Pra. du Sac, Wis."
Beginning of High Water at Power Dam
October 7, 1911
Elevated view of the rising waters of the Wisconsin River at the construction site. This view shows the coffer dam, pile drivers, and narrow gauge railroad. Note the partially submerged trees upriver.