Date: | 1973 |
---|---|
Description: | Worker attaching the right front wheel to an International 1066 Turbo tractor along an assembly line. |
Date: | 1973 |
---|---|
Description: | Assembly line worker greasing a three point arm link on a Farmall 66 series tractor - possibly a 1066. |
Date: | 1973 |
---|---|
Description: | An unidentified employee of the Evans Fur Company, represented by the Amalgamated Meat Cutters and Butcher Workers Union. |
Date: | 1973 |
---|---|
Description: | A factory worker on a tractor assembly line at International Harvester's Saltillo Works in Mexico. |
Date: | 1973 |
---|---|
Description: | Buildings near International Harvester's Saltillo Works in Mexico. A donkey stands at left, and a tractor is parked in front of a building near a large, st... |
Date: | 1973 |
---|---|
Description: | A man opens the driver's side door of an International Cargostar truck carrying a piece of construction equipment at what appears to be a building site. |
Date: | 1973 |
---|---|
Description: | In the foreground is a man in a 350 Pay Hauler. In the background a Hough Pay Loader is loading material into another 350 Pay Hauler. Morrison-Knudsen Co.,... |
Date: | 1973 |
---|---|
Description: | Elevated view of a man operating a Hough Pay Loader to load material into a 350 Pay Hauler. In the background is another Pay Hauler. Morrison-Knudsen Co., ... |
Date: | 1973 |
---|---|
Description: | A man operating a Hough Pay Loader is loading material into a 350 Pay Hauler. Morrison-Knudsen Co., Inc. and Gordon H. Ball, Inc., a joint venture have a c... |
Date: | 1973 |
---|---|
Description: | Four 350 Pay Haulers lined up in a row. There is a tanker truck parked on the left. Morrison-Knudsen Co., Inc. and Gordon H. Ball, Inc., a joint venture ha... |
Date: | 1973 |
---|---|
Description: | Elevated view of a man operating a Hough Pay Loader to load material into a 350 Pay Hauler. In the background is another Pay Hauler. Morrison-Knudsen Co., ... |
Date: | 1973 |
---|---|
Description: | Man operating a 433 Pay Scraper. Shepherd Construction Company, Inc., has sub-contract for grading and drainage work on section of Georgia Route 333. |
Date: | 1973 |
---|---|
Description: | Rear view of two 433 Pay Scrapers moving across a bridge. Shepherd Construction Company, Inc., has sub-contract for grading and drainage work on section of... |
Date: | 1973 |
---|---|
Description: | Man operating a TD-25. Shepherd Construction Company, Inc., has sub-contract for grading and drainage work on section of Georgia Route 333. |
Date: | 1973 |
---|---|
Description: | Man operating 433 Pay Scraper. Shepherd Construction Company, Inc., has sub-contract for grading and drainage work on section of Georgia Route 333. |
Date: | 1973 |
---|---|
Description: | Man operating 433 Pay Scraper. Shepherd Construction Company, Inc., has sub-contract for grading and drainage work on section of Georgia Route 333. |
Date: | 1973 |
---|---|
Description: | Three-quarter view from front left of a man operating a TD-25 to move earth. Shepherd Construction Company, Inc., has sub-contract for grading and drainage... |
Date: | 1973 |
---|---|
Description: | View across King Street towards the Arcade building. The right side of the Majestic theater building is on the far left, and then the storefronts are, from... |
Date: | 1973 |
---|---|
Description: | View across State Street towards the Memorial Library during expansion. Graffiti and posters cover the pedestrian walkway through the construction zone. Th... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: