Date: | 1937 |
---|---|
Description: | Frank Lloyd Wright, monitoring the construction and testing of load-bearing pylons for the Johnson Wax Building. |
Date: | 05 02 1927 |
---|---|
Description: | View of Madison businesses on Henry Street, with steel frame construction of the Capitol Theatre in the background. |
Date: | 1912 |
---|---|
Description: | Wisconsin State Capitol (fourth capitol, third in Madison) under construction. View from South Hamilton Street. |
Date: | 09 27 1937 |
---|---|
Description: | Two men consulting a set of plans as part of a store modernization project at an International Harvester dealership. |
Date: | 11 02 1918 |
---|---|
Description: | Residential building site near railroad tracks, looking west. Several houses are under construction. Benham was a "company town" created by International H... |
Date: | 09 07 1930 |
---|---|
Description: | University of Wisconsin-Madison Mechanical Engineering Building at 1513 University Avenue under construction. Men are working on the steel framework. A mas... |
Date: | 09 02 1930 |
---|---|
Description: | University of Wisconsin-Madison Mechanical Engineering Building under construction with steel framework visible, 1513 University Avenue, looking northeast. |
Date: | 08 28 1929 |
---|---|
Description: | Steam shovel operators excavate for the construction of the Lake View Tuberculosis Sanitarium boiler house at 1202 Northport Drive. |
Date: | 07 29 1955 |
---|---|
Description: | Interior of sanctuary of Our Lady Queen of Peace Catholic Church, 401 South Owen Drive, during construction. |
Date: | 03 1911 |
---|---|
Description: | Construction workers posing during construction of the main office at the Wisconsin River dam site. |
Date: | 04 14 1911 |
---|---|
Description: | Completed two-story wood frame main office building at the site of the Wisconsin River dam. |
Date: | 06 19 1911 |
---|---|
Description: | Looking west over the Wisconsin River at the unfinished narrow gauge railroad trestle built for construction of the dam. Two pile drivers are seen in the a... |
Date: | 1969 |
---|---|
Description: | Profile view of a man dressed in a suit and wearing a hat. He is standing in front of a large picture window, which is reflecting the framework during cons... |
Date: | 05 09 1948 |
---|---|
Description: | Bishop William P. O'Connor of the Madison Diocese is shown removing the first shovel of dirt at the ground-breaking of the Queen of Apostles Seminary being... |
Date: | 03 1953 |
---|---|
Description: | Elevated view of construction of the new building, at Sixth Street and Highland Avenue. The downtown can be seen in the background, including the Schlitz c... |
Date: | 11 17 1948 |
---|---|
Description: | Construction scene of the Canada Dry Bottling Company building at 3396 University Avenue. Frenchy's restaurant is in the background. |
Date: | 07 1908 |
---|---|
Description: | Workmen with teams of horses excavate for the new Mercantile Store, later the M.M. Smart Store. A woman is walking on the street nearby, and a boy or man w... |
Date: | 07 1908 |
---|---|
Description: | Workmen with teams of horses excavate for the new Mercantile Store, later the M.M. Smart Store. |
Date: | 03 13 1950 |
---|---|
Description: | A familiar sight around Madison is workers framing in houses. Two workers are working on a roof and dormer. |
Date: | 1912 |
---|---|
Description: | Men working on the construction site for Stationary Engine Test Building #24 at International Harvester's Milwaukee Works factory. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: