Date: | 11 06 1928 |
---|---|
Description: | Man with air hammer working on a road near a parked truck. |
Date: | 11 06 1928 |
---|---|
Description: | A worker is using an air hammer with compressor truck to do work on the road in the 800 block of University Avenue, looking west. Wisconsin Foundry & Machi... |
Date: | 10 03 1928 |
---|---|
Description: | A crane and other machinery are used in the construction of the Wisconsin Power and Light building, 122 West Washington Avenue. |
Date: | 10 11 1928 |
---|---|
Description: | View looking up Fairchild Street towards the Wisconsin Power and Light building, at 122 W. Washington Avenue, under construction, with a man working near a... |
Date: | 09 26 1928 |
---|---|
Description: | View across street towards the front of Felix's bakery, Felix Odehnal, at 715 University Avenue. |
Date: | 03 01 1927 |
---|---|
Description: | Capitol Theatre, 211 State Street, under construction. American Bridge Co. on beams, and an Esser's City Market delivery truck. |
Date: | 04 03 1926 |
---|---|
Description: | Orpheum Theater construction, 216 State Street, looking north, with steam shovel and other equipment. Also shows Holy Redeemer Catholic Church, 128 W. John... |
Date: | 1926 |
---|---|
Description: | Advertising catalog for Austin motor graders and pup rollers with International (McCormick-Deering) 10-20 and 15-30 power plants. The cover features a blac... |
Date: | 1912 |
---|---|
Description: | Road workers leveling road with International Mogul 45 or 30-60 kerosene tractor and Austin Mammoth Steel Reversible Road Machine. |
Date: | 1907 |
---|---|
Description: | Wisconsin Central locomotive No #50 and pile driver No #2 working near Owen. Men stand on and around the tracks. |
Date: | 1907 |
---|---|
Description: | View from shoreline of men standing on the bridge over west branch of the Wolf River. They are constructing the Wisconsin & Northern railroad bridge. |
Date: | |
---|---|
Description: | Railroad bridge construction at an unknown location somewhere on the Chicago, Milwaukee, and St. Paul Railroad line. There is a church in the background on... |
Date: | |
---|---|
Description: | A Chicago, Milwaukee and St. Paul railway bridge under construction. |
Date: | 1955 |
---|---|
Description: | Construction workers erecting a billboard for Hines Lumber using a crane mounted on the back of an International heavy-duty truck. The billboard is sitting... |
Date: | 1934 |
---|---|
Description: | Man bulldozing a pile of dirt with a McCormick-Deering crawler tractor with an attached blade. The blade was manufactured by the Frank G. Hough Company. |
Date: | 1954 |
---|---|
Description: | Man working on a suburban road with an International ID-6 and attached loader. The loader was manufactured by the Frank G. Hough Company. |
Date: | 1950 |
---|---|
Description: | Man working on a residential street with a Hough H-30 front loader. The machine was manufactured by the Frank G. Hough Company. |
Date: | 1935 |
---|---|
Description: | Men using a McCormick-Deering TracTractor (crawler tractor) on a construction project, possibly a tunnel. |
Date: | 1949 |
---|---|
Description: | View of an International L-120 truck with pickup body parked at a residential construction site. Two men in work clothes and hats stand near the truck. |
Date: | 05 09 1949 |
---|---|
Description: | Elevated view from Park Hotel Roof of the remodeling of the Blied Building, 29 West Main Street. Other West Main Street businesses visible are Madison Bank... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: