Date: | 03 01 1927 |
---|---|
Description: | Early view of the construction of the Capitol Theatre revealing the steel frame of the building. Two men are working on the right. |
Date: | 05 02 1927 |
---|---|
Description: | Side view from the roof of Kruse's store, towards the Capitol Theatre under construction, of steel frame of structure. |
Date: | 1925 |
---|---|
Description: | View looking down at workers at work below street level, with cranes and International trucks excavating area for the future New York City subway. On the r... |
Date: | 1929 |
---|---|
Description: | Workers are looking on as a Bucyrus Erie excavating crane is loading dirt into the bed of an International heavy-duty dump truck. |
Date: | 08 19 1925 |
---|---|
Description: | Workers are removing dirt for the construction of the New York City subway with a Bucyrus shovel loader and an International truck. The workers are below s... |
Date: | 08 01 1928 |
---|---|
Description: | View looking north from corner of Monona Avenue and Wilson Street of front and side of the building, with workmen finishing the basement level. Automobiles... |
Date: | 01 02 1929 |
---|---|
Description: | Interior view of first floor lobby with construction debris and some tile work completed on the floor. In the background a man is standing on a ladder near... |
Date: | 12 27 1929 |
---|---|
Description: | Four men laying Novoid Corkboard on the roof of the Tenney Building, located at 110 East Main Street. |
Date: | 10 01 1929 |
---|---|
Description: | State Bank of Wisconsin addition from the rear, 1 W. Main Street, under construction. "J.H. Kelly general contractor." |
Date: | 10 22 1929 |
---|---|
Description: | Workmen inside a new corridor addition under construction in the State Bank of Wisconsin, 1 West Main Street. |
Date: | 10 22 1929 |
---|---|
Description: | Workers posing on the balcony of the State Bank of Wisconsin addition under construction, 1 West Main Street. |
Date: | 09 04 1929 |
---|---|
Description: | Addition to State Bank of Wisconsin under construction, with construction workers. 1 W. Main Street. |
Date: | 08 28 1929 |
---|---|
Description: | Five men are working on the heat tunnel construction for the Lake View TB sanatorium. 1202 Northport Drive. |
Date: | 08 28 1929 |
---|---|
Description: | Steam shovel operators excavate for the construction of the Lake View Tuberculosis Sanitarium boiler house at 1202 Northport Drive. |
Date: | 08 19 1929 |
---|---|
Description: | Workers lay pipe and repave University Avenue, looking east along the 2400 block. |
Date: | 08 22 1929 |
---|---|
Description: | Steam shovel loading a truck as part of road construction in front of Collins Lumber Co., 2308 University Avenue. There is a horse-drawn wagon passing by. ... |
Date: | 07 24 1929 |
---|---|
Description: | Carbide & Carbon Chemicals Co. Pyrofax plant, 130 Fair Oaks Avenue, view looking south west. |
Date: | 08 1929 |
---|---|
Description: | Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue. Men are pouring a cement floor. |
Date: | 09 1929 |
---|---|
Description: | View across field towards the Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue, almost finished. |
Date: | 09 1929 |
---|---|
Description: | View across field towards the Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue, almost finished. |