Search the Wisconsin Historical Society's collections

Searching for

Refine by

Results 1-8 of 8

Photograph

Men Standing on Railroad Car

Date: 04 1911
Description: Group of men standing on and beside a rail car in front of the main construction office at the site of the Wisconsin River dam.
Photograph

Extension Railroad to Power Dam Under High Water

Date: 10 12 1911
Description: Two men are standing on the tracks of the newly constructed railroad extension to the construction site of the Prairie du Sac dam. Behind them, the tracks...
Photograph

Railroad to Power Dam Washed Out by Flood

Date: 10 18 1911
Description: Receding flood waters reveal destruction of the railroad extension to the power dam construction site.
Photograph

Railroad to Power Dam Washed Out by Flood

Date: 10 18 1911
Description: Workmen standing on damaged and partly submerged railroad track on the west shore of the Wisconsin River.
Photograph

General View of Power House Coffer Dam and High Trestle

Date: 07 16 1912
Description: An overview, from the west bank, of the power dam construction site. The high trestle is in the background, and the narrow gauge electric railroad is in th...
Photograph

General View of Power House at Power Dam

Date: 06 29 1913
Description: View from the west bank of the Wisconsin River showing progress on the power dam. The narrow gauge track is visible in the foreground.
Photograph

Construction Workers at Dam Construction Site

Date: 1915
Description: Elevated view of a group of workers posing on the east bank of the Wisconsin River at the power dam construction site. One man is strumming his shovel like...
Photograph

High Bridge and West Shore Coffer Dam

Date: 08 01 1912
Description: Elevated view of the power dam construction site from the west, showing the elevated trestle, coffer dam, and steam pile drivers. The concrete plant is vis...

Have Questions?

If you didn't find the material you searched for, our Library Reference Staff can help.

Call our reference desk at 608-264-6535 or email us at: