Date: | |
---|---|
Description: | Barn raising. The foundation is constructed from local fieldstone or "pudding stone," found in the nearby fields. A large group of men are is posing holdin... |
Date: | 1913 |
---|---|
Description: | Workmen stand atop and in front of the remnants of the last remaining wing, the North Wing, of the third Wisconsin State Capitol building. |
Date: | 1907 |
---|---|
Description: | The construction of the East Wing of the new Capitol is underway. This is a view of the North and South Wings and the dome of the Third Wisconsin State Cap... |
Date: | 1883 |
---|---|
Description: | The third Wisconsin State Capitol after the unfinished South Wing collapsed on November 8, 1883. Defective workmanship and shoddy construction materials ca... |
Date: | 08 28 1929 |
---|---|
Description: | Steam shovel operators excavate for the construction of the Lake View Tuberculosis Sanitarium boiler house at 1202 Northport Drive. |
Date: | 10 1869 |
---|---|
Description: | The second Wisconsin State Capitol dome under construction, showing the workmen and the equipment they used to hoist construction materials into place. |
Date: | 1932 |
---|---|
Description: | Workers working on the construction of the drafting studio at the Taliesin Fellowship Complex used by the Taliesin Fellowship. The Romeo and Juliet windmil... |
Date: | 1932 |
---|---|
Description: | Constuction workers working on the construction of the drafting studio at the Taliesin Fellowship Complex. The roof trusses and stone walls are in place. C... |
Date: | 04 14 1911 |
---|---|
Description: | Completed two-story wood frame main office building at the site of the Wisconsin River dam. |
Date: | 06 19 1911 |
---|---|
Description: | Looking west over the Wisconsin River at the unfinished narrow gauge railroad trestle built for construction of the dam. Two pile drivers are seen in the a... |
Date: | 11 17 1948 |
---|---|
Description: | Construction scene of the new enzyme laboratory at 1710 University Avenue. |
Date: | 04 23 1970 |
---|---|
Description: | A small group of workers mill around the foot of the festival stage mid-construction. |
Date: | |
---|---|
Description: | View of Daisy and L.C. Bates's house under construction. |
Date: | |
---|---|
Description: | Exterior view of front of the house of Daisy and L.C. Bates. The house is under construction. The walls and roof have been built, and a pile of bricks are ... |
Date: | 1941 |
---|---|
Description: | A man loading an International K-5 truck with sectional housing pieces and lumber while parked alongside a rural road. The text on the truck reads: "Econom... |
Date: | 05 03 1892 |
---|---|
Description: | Tree planting ceremony on the Wooded Island during construction of the Columbian Exposition in Jackson Park. Standing to the left of the tree wrapped with ... |
Date: | 06 1967 |
---|---|
Description: | Composite panoramic view of the south side of the 700 block of State Street. Lake Street parking ramp and University of Wisconsin Extension building are vi... |
Date: | |
---|---|
Description: | Photographic postcard view of workers building the new Episcopal Church. Workers in hats and overalls, and holding shovels, are standing among scaffolding,... |
Date: | 1931 |
---|---|
Description: | The entrance to the bridge during construction. A worker works on the side of the bridge on the right. Other workers in the middle of the bridge lay boards... |
Date: | 1922 |
---|---|
Description: | Construction workers pose at the entrance of the public school during construction. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: