Date: | |
---|---|
Description: | Barn raising. The foundation is constructed from local fieldstone or "pudding stone," found in the nearby fields. A large group of men are is posing holdin... |
Date: | 1913 |
---|---|
Description: | Workmen stand atop and in front of the remnants of the last remaining wing, the North Wing, of the third Wisconsin State Capitol building. |
Date: | 1907 |
---|---|
Description: | The construction of the East Wing of the new Capitol is underway. This is a view of the North and South Wings and the dome of the Third Wisconsin State Cap... |
Date: | 1883 |
---|---|
Description: | The third Wisconsin State Capitol after the unfinished South Wing collapsed on November 8, 1883. Defective workmanship and shoddy construction materials ca... |
Date: | 05 03 1919 |
---|---|
Description: | Workers building a culvert over Maggard's Branch near mine no. 2. Benham was a "company town" created by International Harvester for the workers employed i... |
Date: | 03 29 1919 |
---|---|
Description: | Men building a dock along railroad tracks. The tracks run along a stream or small river. Benham was a "company town" created by International Harvester for... |
Date: | 08 28 1929 |
---|---|
Description: | Steam shovel operators excavate for the construction of the Lake View Tuberculosis Sanitarium boiler house at 1202 Northport Drive. |
Date: | 1949 |
---|---|
Description: | Construction worker clears trees along a hillside with an International diesel TD-24 TracTracTor (crawler tractor). |
Date: | 10 1869 |
---|---|
Description: | The second Wisconsin State Capitol dome under construction, showing the workmen and the equipment they used to hoist construction materials into place. |
Date: | 1932 |
---|---|
Description: | Workers working on the construction of the drafting studio at the Taliesin Fellowship Complex used by the Taliesin Fellowship. The Romeo and Juliet windmil... |
Date: | 1932 |
---|---|
Description: | Constuction workers working on the construction of the drafting studio at the Taliesin Fellowship Complex. The roof trusses and stone walls are in place. C... |
Date: | 04 14 1911 |
---|---|
Description: | Completed two-story wood frame main office building at the site of the Wisconsin River dam. |
Date: | 06 19 1911 |
---|---|
Description: | Looking west over the Wisconsin River at the unfinished narrow gauge railroad trestle built for construction of the dam. Two pile drivers are seen in the a... |
Date: | 11 17 1948 |
---|---|
Description: | Construction scene of the new enzyme laboratory at 1710 University Avenue. |
Date: | 1937 |
---|---|
Description: | Elevated view of construction workers placing rebar in the foundation of a house in preparation for concrete to be poured. |
Date: | |
---|---|
Description: | A group of men constructing a bungalow at University Settlement Camp. Three ladders are being used and five men are on the roof. |
Date: | 1950 |
---|---|
Description: | An International LF-190 truck equipped with a concrete mixer in front of a tall building marked: "Readymix Concrete Co." Men are looking out the building's... |
Date: | 04 23 1970 |
---|---|
Description: | A crew works with plywood during construction of the food stalls at the Sound Storm music festival. |
Date: | 04 23 1970 |
---|---|
Description: | A small group of workers mill around the foot of the festival stage mid-construction. |
Date: | 04 23 1970 |
---|---|
Description: | Four workers amid construction of food stalls out of plywood a day or two before the beginning of the Sound Storm music festival. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: