Date: | |
---|---|
Description: | Slightly elevated view of men working on the Kilbourn dam. |
Date: | 05 05 1911 |
---|---|
Description: | Elevated view of construction on Arpin's dam. Men are working on the right. Caption reads: "Arpin's Dam at Radisson, Wis". |
Date: | |
---|---|
Description: | View from railroad tracks towards industrial activity on the edge of the river, possibly building a dam. |
Date: | |
---|---|
Description: | Men working on the foundation of a building, possibly laying a foundation for the post-flood business district dam. |
Date: | 1900 |
---|---|
Description: | View across water of men working to construct a brush dam about seven miles north of Cassville. There are two groups of well-dressed people, who appear to ... |
Date: | |
---|---|
Description: | Outdoor view of the construction of a large building on top of a dam. Location identified as the construction of the powerhouse on the canal in Hatfield. |
Date: | 1935 |
---|---|
Description: | Panoramic view of the construction of the Norris Dam, looking upstream. On the left the text reads: "West Bank," and on the right it reads: "East Bank." |
Date: | 12 13 1938 |
---|---|
Description: | Elevated, panoramic view of the Wheeler Dam from the south side of the Tennessee River. |
Date: | 08 01 1936 |
---|---|
Description: | Elevated, panoramic view of the Pickwick Dam under construction. |
Date: | 03 24 1937 |
---|---|
Description: | Elevated, panoramic view of the construction of the Pickwick Dam power house and spillway. |
Date: | 02 15 1938 |
---|---|
Description: | Two men are standing on the stone wall, and another man is standing on scaffolding inside the dam. In the foreground are large stones, logs, and water. Han... |
Date: | 02 15 1938 |
---|---|
Description: | A group of men are working on the dam. Handwritten on back: "Outside of Dam wall at center." |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: