Date: | 07 23 1931 |
---|---|
Description: | Capital Times model home under construction at 2318 Monroe Street. |
Date: | 12 19 1936 |
---|---|
Description: | View across street towards a three-story house on Bernard Court. The address on the door reads "202," and a sled is leaning up against the wall near the fr... |
Date: | 07 20 1932 |
---|---|
Description: | Group of men sitting on top of railroad flatbed car loaded with culverts. Sign above them reads: "Capital City Culvert Company," 1335 Gilson Street. |
Date: | 07 02 1930 |
---|---|
Description: | State Office Building, Wilson Street, construction showing concrete mixer, workers, and a Castle & Doyle truck dumping. |
Date: | 06 07 1930 |
---|---|
Description: | Basement of State Office Building, 1 W. Wilson Street, under construction, facing towards Wilson Street. |
Date: | 08 01 1930 |
---|---|
Description: | Basement and ground floor of State Office Building, 1 W. Wilson Street, under construction. View toward Lake Monona. |
Date: | 08 28 1929 |
---|---|
Description: | Five men are working on the heat tunnel construction for the Lake View TB sanatorium. 1202 Northport Drive. |
Date: | 07 24 1929 |
---|---|
Description: | Carbide & Carbon Chemicals Co. Pyrofax plant, 130 Fair Oaks Avenue, view looking south west. |
Date: | 08 1929 |
---|---|
Description: | Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue. Men are pouring a cement floor. |
Date: | 09 1929 |
---|---|
Description: | View across field towards the Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue, almost finished. |
Date: | 09 1929 |
---|---|
Description: | View across field towards the Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue, almost finished. |
Date: | 09 14 1929 |
---|---|
Description: | Dane County Tuberculosis Sanatorium. Crane at construction site. 1202 Northport Drive. J.P. Cullen, Contractor. |
Date: | 04 03 1926 |
---|---|
Description: | Orpheum Theater construction, 216 State Street, looking north, with steam shovel and other equipment. Also shows Holy Redeemer Catholic Church, 128 W. John... |
Date: | 03 03 1926 |
---|---|
Description: | Orpheum Theater under construction, 216 State Street, looking west. Also shows Holy Redeemer Catholic Church, 128 W. Johnson Street, Holy Redeemer Rectory,... |
Date: | 10 1869 |
---|---|
Description: | The second Wisconsin State Capitol dome under construction, showing the workmen and the equipment they used to hoist construction materials into place. |
Date: | 1905 |
---|---|
Description: | Construction of new streetcar tracks on the Capitol Square. In the background, on the corner of Main and Carroll streets, is the Park Hotel. Behind the hot... |
Date: | 1932 |
---|---|
Description: | Workers working on the construction of the drafting studio at the Taliesin Fellowship Complex used by the Taliesin Fellowship. The Romeo and Juliet windmil... |
Date: | 1932 |
---|---|
Description: | Constuction workers working on the construction of the drafting studio at the Taliesin Fellowship Complex. The roof trusses and stone walls are in place. C... |
Date: | |
---|---|
Description: | Barn raising at Lars Davidsen Reque's home. Crew members can be seen mortising freshly hewn timbers with a hand-operated boring machine. Men are also seen ... |
Date: | |
---|---|
Description: | A work crew raising the bents of a barn framing system using pike poles. A valley is in the background beyond the hill where the barn is being constructed. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: