Description: | Workers posing inside the forms for the east shore abutment at the power dam site. |
Date: | 10 12 1911 |
---|---|
Description: | High water has scattered timber pilings through the construction camp. The office is on the right; the smokestacks of the temporary power plant are behind ... |
Date: | 05 17 1912 |
---|---|
Description: | Elevated view of workers using shovels to level fresh concrete at the base of the chutes from the high trestle. The steam powered pile driver is at work in... |
Date: | 05 31 1912 |
---|---|
Description: | Workers maneuvering a load of gravel into a concrete mixer at the plant on the east bank of the river. The east abutment is in the foreground, left. |
Date: | 07 16 1912 |
---|---|
Description: | Workers posing inside the coffer dam. The narrow gauge railroad is behind them. One of the pile drivers is in the background. A bare area on the bluff in t... |
Date: | 08 01 1912 |
---|---|
Description: | Elevated view of the power dam construction site from the west, showing the elevated trestle, coffer dam, and steam pile drivers. The concrete plant is vis... |
Date: | 09 30 1912 |
---|---|
Description: | Forms have been removed from the first concrete poured for the power house in the northeast corner of the coffer dam. Men are pouring concrete from rail ca... |
Date: | 01 09 1913 |
---|---|
Description: | Men are standing in the completed draft tubes after removal of the steel forms. |
Date: | 07 02 1913 |
---|---|
Description: | Workers pause while installing a maze of conduit for the switchboard in the power house. The construction camp is to the left. |
Date: | 1929 |
---|---|
Description: | A drawing of a State Office Building as originally proposed. |
Date: | 1929 |
---|---|
Description: | The state architect, Arthur Peabody's drawing of the proposed building plans of a State Office Building. |
Date: | 1929 |
---|---|
Description: | State architect, Arthur Peabody's rendition of the State Office Building at 1 West Wilson Street. |
Date: | |
---|---|
Description: | Two men working on the construction of a building at Highlander Folk School. |
Date: | 05 28 1911 |
---|---|
Description: | Men posing on a barge carrying a steam powered pile driver at work on the coffer dam for the construction of the powerhouse. Caption reads: "Driving Sheet ... |
Date: | 03 1953 |
---|---|
Description: | Elevated view of construction of the new building, at Sixth Street and Highland Avenue. The downtown can be seen in the background, including the Schlitz c... |
Date: | 08 17 1948 |
---|---|
Description: | Members of the West Side Business Men's Association shown as they met for the first time at the future site of their new clubhouse and community center on ... |
Date: | |
---|---|
Description: | Men working around a small building near the construction site of a dam. Two men are standing on the roof. Houses and other buildings are on a hill in the ... |
Date: | 07 1908 |
---|---|
Description: | Workmen with teams of horses excavate for the new Mercantile Store, later the M.M. Smart Store. A woman is walking on the street nearby, and a boy or man w... |
Date: | 07 1908 |
---|---|
Description: | Workmen with teams of horses excavate for the new Mercantile Store, later the M.M. Smart Store. |
Date: | |
---|---|
Description: | An interior view of partially-built dressing court, showing men working at roughing in plumbing to floor drains of the bathhouse at Devil's Lake State Park... |