Date: | 1935 |
---|---|
Description: | John Seltzer (left) and T.C. Phillips examine a blueprint in the Engineering Department of International Harvester's Fort Wayne Works. |
Date: | 1945 |
---|---|
Description: | Factory worker Joan Harris sits at a workspace to inspect a 20 mm cannon bolt body part at International Harvester's St. Paul Works. Tools are on the table... |
Date: | 02 1935 |
---|---|
Description: | Engineers working on blueprints in the Drafting Room at International Harvester's Ft. Wayne Works. |
Date: | 1935 |
---|---|
Description: | D.G. Renno (left) and H.K. Reinoehl look over blueprints in the Engineering Department at International Harvester's Ft. Wayne Works. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: