Date: | 03 01 1927 |
---|---|
Description: | Early view of the construction of the Capitol Theatre revealing the steel frame of the building. Two men are working on the right. |
Date: | 05 02 1927 |
---|---|
Description: | Side view from the roof of Kruse's store, towards the Capitol Theatre under construction, of steel frame of structure. |
Date: | 08 01 1928 |
---|---|
Description: | View looking north from corner of Monona Avenue and Wilson Street of front and side of the building, with workmen finishing the basement level. Automobiles... |
Date: | 01 02 1929 |
---|---|
Description: | Interior view of first floor lobby with construction debris and some tile work completed on the floor. In the background a man is standing on a ladder near... |
Date: | 09 04 1929 |
---|---|
Description: | Addition to State Bank of Wisconsin under construction, with construction workers. 1 W. Main Street. |
Date: | 08 28 1929 |
---|---|
Description: | Five men are working on the heat tunnel construction for the Lake View TB sanatorium. 1202 Northport Drive. |
Date: | 08 28 1929 |
---|---|
Description: | Steam shovel operators excavate for the construction of the Lake View Tuberculosis Sanitarium boiler house at 1202 Northport Drive. |
Date: | 07 24 1929 |
---|---|
Description: | Carbide & Carbon Chemicals Co. Pyrofax plant, 130 Fair Oaks Avenue, view looking south west. |
Date: | 08 1929 |
---|---|
Description: | Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue. Men are pouring a cement floor. |
Date: | 09 1929 |
---|---|
Description: | View across field towards the Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue, almost finished. |
Date: | 09 1929 |
---|---|
Description: | View across field towards the Carbide & Carbon Chemicals Co. Pyrofax plant under construction, 130 Fair Oaks Avenue, almost finished. |
Date: | 07 10 1929 |
---|---|
Description: | Dane County Tuberculosis Sanatorium under construction, with three men with a steam shovel clearing trees. 1202 Northport Drive. J.P. Cullen, Contractor. |
Date: | 07 10 1929 |
---|---|
Description: | Dane County Tuberculosis Sanatorium under construction, with three men with a steam shovel clearing trees. 1202 Northport Drive. J.P. Cullen, Contractor. |
Date: | 09 14 1929 |
---|---|
Description: | Dane County Tuberculosis Sanatorium. Crane at construction site. 1202 Northport Drive. J.P. Cullen, Contractor. |
Date: | 03 28 1929 |
---|---|
Description: | Men working on the concrete forms for the roof of the addition to the University of Wisconsin hydraulics laboratory, 660 N. Park Street looking north over ... |
Date: | 03 28 1929 |
---|---|
Description: | Elevated view from the south east of men constructing the concrete forms for the roof of the addition to the University of Wisconsin-Madison hydraulics lab... |
Date: | 10 11 1928 |
---|---|
Description: | View looking up Fairchild Street towards the Wisconsin Power and Light building, at 122 W. Washington Avenue, under construction, with a man working near a... |
Date: | 03 01 1927 |
---|---|
Description: | Capitol Theatre, 211 State Street, under construction. View from the roof of Kruse's store towards two workmen and the construction house. |
Date: | 04 03 1926 |
---|---|
Description: | Orpheum Theater construction, 216 State Street, looking north, with steam shovel and other equipment. Also shows Holy Redeemer Catholic Church, 128 W. John... |
Date: | 03 03 1926 |
---|---|
Description: | Orpheum Theater under construction, 216 State Street, looking west. Also shows Holy Redeemer Catholic Church, 128 W. Johnson Street, Holy Redeemer Rectory,... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: