Date: | 01 1938 |
---|---|
Description: | Men are standing on scaffolding working on the roof near the top of the chimney. A tree is near the log building on the right. Handwritten on back: "Slave ... |
Date: | 01 1938 |
---|---|
Description: | View of the end of the building showing scaffolding around the the log walls, and the peaked roof above. Handwritten on back: "Slave Quarters in process of... |
Date: | 03 26 1938 |
---|---|
Description: | View towards side of slave log cabin which has a peaked roof. A ladder is set up for access to the roof. Scaffolding is on the left and right ends of the b... |
Date: | 03 26 1938 |
---|---|
Description: | View towards side of cabin, which has a door and window opening in the log structure. Scaffolding is set up around the building, and tools and building mat... |
Date: | 05 09 1938 |
---|---|
Description: | View towards side of slave log cabin with a door in the center and a small horizontal window to the left. The roof is peaked and shingles are in place. The... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: