Date: | |
---|---|
Description: | Outdoor view of men working at a construction site. Identified as the construction of the third powerhouse which also entailed moving the second powerhouse... |
Date: | |
---|---|
Description: | Outdoor view of the construction of a large building on top of a dam. Location identified as the construction of the powerhouse on the canal in Hatfield. |
Date: | 1907 |
---|---|
Description: | Elevated view across rushing water towards a construction site of a dam on a river. Identified as the construction of the Hatfield Dam, looking northwest. |
Date: | |
---|---|
Description: | Outdoor view of a construction site of large pipes and other building materials. Identified as the construction site of the powerhouse at the Hatfield dam ... |
Date: | 1907 |
---|---|
Description: | View of the construction site of a dam on a river. Identified as the construction of the Hatfield dam in 1907. |
Date: | 1907 |
---|---|
Description: | Elevated view of the construction site of a dam on a river. Identified as the construction of the Hatfield dam in 1907, looking north up the Black River. |
Date: | 1907 |
---|---|
Description: | View over shrubs and plants towards the construction site of a dam across a river. Identified as the construction of the Hatfield dam across the Black Rive... |
Date: | |
---|---|
Description: | View across field towards two men posing standing on the frame of a barn under construction next to a large haystack. |
Date: | 1911 |
---|---|
Description: | Outdoor view of a construction site, with wreckage in a ditch. Location identified as the fill and reconstruction of Town Creek after the 1911 flood in Bla... |
Date: | 1911 |
---|---|
Description: | View towards a construction site, with men working by a railway track with sand haulers, and a brick viaduct. Location identified as the fill and reconstru... |
Date: | 1911 |
---|---|
Description: | Elevated view of a construction site, with wreckage behind a wooden wall. Location identified as the fill and reconstruction of Town Creek after the 1911 f... |
Date: | |
---|---|
Description: | View of wreckage in a ditch. Location identified as the fill and reconstruction of Town Creek after the 1911 flood in Black River Falls, and the wreck of t... |
Date: | 1903 |
---|---|
Description: | View towards a construction site. Individuals are standing high up on top of brick foundations. Identified as the construction of the Omaha cut-off bridge. |
Date: | |
---|---|
Description: | A brick structure is under construction with a large group of people posing next to it. |
Date: | |
---|---|
Description: | A group of workers are posing next to a brick structure under construction. Snow is on the ground. |
Date: | |
---|---|
Description: | Elevated vis iew of a barn raising. One man standing in the framework, and a group of men are standing on the left. |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: