Date: | 1985 |
---|---|
Description: | View from an overpass of a resurfacing operation on I90/94 near Madison. |
Date: | 1985 |
---|---|
Description: | A Ford Truck cement mixer delivers concrete for a pour during construction on one of the Wisconsin Interstate Highways. |
Date: | 01 1981 |
---|---|
Description: | Empty snowy plains soon to be turned into Rt. 81. Hills and a few poles are in the far distance. |
Date: | 04 27 1987 |
---|---|
Description: | A city worker fills in holes in the road in mild spring weather. |
Date: | 06 1984 |
---|---|
Description: | Workmen tear down the old overpass on Route 67 in Lomira. |
Date: | 10 23 1985 |
---|---|
Description: | A group of five people are working on freshly poured cement outside a shop called Mac's Archery Supplies, Inc. Caption reads: "A group from Wiggins Constru... |
Date: | 1985 |
---|---|
Description: | As part of resurfacing work on the Interstate pieces of concrete and rebar are loaded into an International dump truck. |
Date: | 10 01 1980 |
---|---|
Description: | An International S-Series truck with a trailer on a dirt road in front of a newly-constructed silo and several barns and farm buildings. |
Date: | 1985 |
---|---|
Description: | A Caterpillar shovel loads excavated concrete and rebar on the back of a dump truck during the course of reconstruction work on one of Wisconsin's intersta... |
Date: | 09 29 1983 |
---|---|
Description: | Two shirtless men are standing in freshly poured cement using shovels. A third man is standing behind them. Caption reads: "Jim Kreilkamp (left) and Roy He... |
Date: | 06 20 1985 |
---|---|
Description: | View of a bridge, with cars parked along the sides, and a "Road Closed" sign in the left foreground. Caption reads: "NEW BRIDGE — Work on the Falls Rd. bri... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: