Date: | 1917 |
---|---|
Description: | Exterior view of International Harvester branch house. Signs on the building advertise farm machines, oil tractors, engines, wagons and motor trucks. A lon... |
Date: | 06 19 1911 |
---|---|
Description: | Looking west over the Wisconsin River at the unfinished narrow gauge railroad trestle built for construction of the dam. Two pile drivers are seen in the a... |
Date: | 06 21 1911 |
---|---|
Description: | Looking east over the Wisconsin River showing the unfinished narrow gauge railroad trestle. Two steam-driven pile drivers on barges with construction worke... |
Date: | 09 12 1911 |
---|---|
Description: | An overview of the dam site on the Wisconsin River from the west shore. Three pile drivers are at work on the coffer dam. The railroad trestle is in the ... |
Date: | 10 07 1911 |
---|---|
Description: | Workers attempt to secure the trestle against high water on the Wisconsin River during construction of the power dam. |
Date: | 09 03 1912 |
---|---|
Description: | An experimental reaper(?) in a factory yard. There is a Russian name on the Reaper, and the front is set up on saw-horses. Men are working near a brick fac... |
Date: | |
---|---|
Description: | View of a railroad bridge with a train crossing it. A man can be seen standing on the ground next to the bridge. Caption reads: "R.R. Bridge At Fox Gulch, ... |
Date: | 1900 |
---|---|
Description: | Wisconsin Central train passing over the White River bridge. The first railroad car is imprinted with "U.S. Mail." |
Date: | 1900 |
---|---|
Description: | View from the top of the Wisconsin Central Railroad White River bridge. |
Date: | 12 29 1912 |
---|---|
Description: | Elevated view of the progress within the coffer dam showing concrete forms around the draft tubes and gate guides. The high trestle is seen extending to th... |
Date: | 02 08 1913 |
---|---|
Description: | A winter view with workers posing with brush mats at the power dam construction site. The gate guides and high trestle form the background. |
Date: | 03 19 1913 |
---|---|
Description: | A view, looking east, of the wreckage of the high trestle caused by flooding and ice. The concrete plant is visible on the far bank. |
Date: | 02 01 1914 |
---|---|
Description: | A view looking west toward the lock and power house at the Prairie du Sac dam. Pilings and the elevated trestle are in the foreground. Men can be seen work... |
Date: | 03 11 1914 |
---|---|
Description: | Elevated view looking east from the lock at the Prairie du Sac dam. Recently completed buttresses are in the foreground, with earlier stages of constructio... |
Date: | 08 06 1911 |
---|---|
Description: | A view following the lower trestle to the west bank. The construction camp buildings, including the office and temporary power plant are seen on the left. |
Date: | 05 17 1912 |
---|---|
Description: | Elevated view of workers using shovels to level fresh concrete at the base of the chutes from the high trestle. The steam powered pile driver is at work in... |
Date: | 08 01 1912 |
---|---|
Description: | Elevated view of the power dam construction site from the west, showing the elevated trestle, coffer dam, and steam pile drivers. The concrete plant is vis... |
Date: | 09 30 1912 |
---|---|
Description: | Forms have been removed from the first concrete poured for the power house in the northeast corner of the coffer dam. Men are pouring concrete from rail ca... |
Date: | 1950 |
---|---|
Description: | Looking south. Bridge in foreground is over Kinnickinnic River. Bridge over the road holds railroad tracks. In background are several houses and a build... |
Date: | 1889 |
---|---|
Description: | Chicago & North Western Railway viaduct on the line along the Milwaukee River. The viaduct has two arched passages, and stones and rocks lining the path f... |
If you didn't find the material you searched for, our Library Reference Staff can help.
Call our reference desk at 608-264-6535 or email us at: