Date: | 10 07 1911 |
---|---|
Description: | Workers attempt to secure the trestle against high water on the Wisconsin River during construction of the power dam. |
Date: | 02 08 1913 |
---|---|
Description: | A winter view with workers posing with brush mats at the power dam construction site. The gate guides and high trestle form the background. |
Date: | 03 11 1914 |
---|---|
Description: | Elevated view looking east from the lock at the Prairie du Sac dam. Recently completed buttresses are in the foreground, with earlier stages of constructio... |
Date: | 05 17 1912 |
---|---|
Description: | Elevated view of workers using shovels to level fresh concrete at the base of the chutes from the high trestle. The steam powered pile driver is at work in... |
Date: | 09 30 1912 |
---|---|
Description: | Forms have been removed from the first concrete poured for the power house in the northeast corner of the coffer dam. Men are pouring concrete from rail ca... |
Date: | 1903 |
---|---|
Description: | Switchman standing at the switch next to railroad tracks cut through a rock formation. Another man is standing on top of the rock formation on the left. In... |
Date: | |
---|---|
Description: | Stereograph of four men standing with ore carts. Two more men are standing on the left near a pile of square timbers, and another man is standing on the ri... |